Thu. Oct 16th, 2025
PM Fan Replacement ProgramPM Fan Replacement Program

In the sweltering summers of Pakistan, a fan isn’t a luxury — it’s a necessity. But with rising electricity bills and frequent load-shedding, old, energy-draining fans are burning more than just wires — they’re burning a hole in our pockets.

To combat this issue, the government of Pakistan has launched the PM Fan Replacement Program 2025, an energy-efficiency initiative that helps households replace old fans with new, energy-saving models — all on easy, interest-free installments.

Punjab Solar Tubewell ProjectPunjab Solar Tubewell Project 2025 – Powering the Future of Agriculture

This program isn’t just about fans; it’s about cutting electricity bills, reducing load on the national grid, and giving relief to low and middle-income families.

What Is the PM Fan Replacement Program?

The PM Fan Replacement Program is a government-backed scheme under the broader umbrella of energy conservation efforts in Pakistan.

It allows eligible households to:

  • Replace up to 5 old ceiling fans with certified energy-efficient fans
  • Pay in monthly installments, spread across 12 to 24 months
  • Save up to 40% on electricity consumption per fan
  • Reduce overall household electricity bills by Rs. 1,000–1,800 per month, depending on usage

These fans are designed to use as little as 35–50 watts per unit compared to the traditional 80–120-watt fans common in most homes.

What’s Included in the Offer?

Here’s what beneficiaries of the program can expect:

FeatureDetails
Energy-Efficient FansBLDC-based, low-watt fans with long-life motors
Brands InvolvedOnly approved local manufacturers participating
WarrantyMinimum 3-year motor warranty
Colors & SizesStandard 48-inch sizes, available in 2–3 colors
DeliveryAvailable at pickup centers or doorstep in select cities
InstallationOptional; additional small fee or DIY

Installment Plans & Pricing

The government is offering zero-interest, subsidized installment plans, managed through banks, utility companies, or microfinance institutions.

Fan TypePrice Per FanMonthly Installment (12 months)Monthly Installment (24 months)
Standard (BLDC 50W)Rs. 7,000Rs. 583Rs. 291
Premium (with remote)Rs. 9,500Rs. 791Rs. 395

No upfront payment is required for many applicants. Payments are often adjusted into your electricity bill, making it seamless and hassle-free.

Punjab Crop Insurance ProgramPunjab Crop Insurance Program 2025 – Securing Farmers Against Uncertainty

Eligibility Criteria

Not every household may be eligible. The basic requirements are:

  • Pakistani CNIC holder
  • Current electricity meter in your name or household
  • Average monthly consumption between 100–500 units
  • No default on utility bills in the last 6 months
  • Limit: Up to 5 fans per household

Special quotas may be available for:

  • Low-income families
  • Women-headed households
  • Senior citizens
  • Persons with disabilities

How to Apply?

The registration and application process is designed to be simple and accessible:

  1. Online Portal Registration
    Enter your CNIC, electricity bill reference number, and contact details.
  2. Verification Phase
    The system checks your eligibility via utility and NADRA databases.
  3. Select Fan Model
    Choose from available fan types and select quantity.
  4. Choose Payment Plan
    Pick between 12 or 24-month installment plans.
  5. Delivery / Pickup Confirmation
    You’ll get notified about delivery/pick-up dates.
  6. Install and Enjoy
    Plug in your new fans and start saving instantly!

In rural areas, mobile vans or partner shops may assist in enrollment and delivery.

How Much Can You Save?

Here’s a quick look at monthly savings per fan:

Punjab Wheat Support ProgramPunjab Wheat Support Program 2025 – Empowering Farmers, Securing Food
Fan TypeDaily UseOld Fan CostNew Fan CostMonthly Saving
Standard12 hrs/dayRs. 850Rs. 450Rs. 400+
Premium15 hrs/dayRs. 1,100Rs. 550Rs. 550+

Multiply this by 3–5 fans per home, and you’re talking about real relief.

FAQs

Q1: Can I buy fans in cash instead of installments?
Yes, but this program is aimed at helping those who can’t pay upfront. Installments are the primary mode.

Q2: What if I miss an installment?
Missed payments may result in suspension from future programs or a penalty after 2–3 months.

Q3: Are pedestal or wall-mounted fans included?
No, only ceiling fans are included under this phase.

Q4: How do I know if my area is covered?
Check during registration. The program is being launched in phases, with major urban and semi-urban areas covered first.

Q5: Can renters apply?
Yes, as long as they have a CNIC and can provide electricity reference number or utility bill in their name or household.

Q6: Are these fans made in Pakistan?
Yes, and only approved local manufacturers are part of this program to promote domestic industry.

Final Word

The PM Fan Replacement Program 2025 is a smart, sustainable, and socially conscious effort by the government to fight energy waste, reduce household expenses, and promote local green technology — all while keeping you cool.

For households struggling with power bills and summer heat, this program is a cool breeze of relief — both literally and financially.

BISE Faisalabad 11th Class ResultBISE Faisalabad 11th Class Result 2025 — Check It Now
Whatsapp.
GET bisp 8171 Qist Free 13500
WhatsApp