Fri. Oct 10th, 2025
Apply Online for New Domestic Gas Connection 2025

As of 2025, Sui Northern Gas Pipelines Limited (SNGPL) has introduced a new, fully digital system for domestic gas connections in Pakistan. All new residential gas connections will now be based on LNG (Liquefied Natural Gas) — replacing the old natural gas system. This means previous applications for natural gas are no longer valid, and citizens must reapply under the updated online process.

Whether you are a first-time applicant or had a pending demand notice, this complete guide covers the online registration process, required documents, fees, priority system, and installation steps to help you secure your new LNG connection without delays.

Wheat Seed PriceGreat News for Farmers: Punjab Slashes Certified Wheat Seed Price by Rs. 1,000 per Bag

🔄 What’s New in 2025?

  • Natural gas connections discontinued – Only LNG-based connections are available.
  • Online-only application system – Manual submissions are not accepted.
  • Special portal for old demand notice holders – Priority service is available.
  • Updated fee structure – Fees now depend on property size and urgency.
  • Neighbour verification required – A recent gas bill from a neighboring property must be submitted.

📝 How to Apply Online for a New Domestic LNG Connection

The entire process is now digital, making it easier, faster, and more transparent for homeowners. Here’s how you can apply:

Step-by-Step Application Process

  1. Visit the official SNGPL LNG Online Application Portal.
  2. Choose “Domestic LNG Connection” as your connection type.
  3. Fill in your personal details, property information, and CNIC number.
  4. Upload all required documents (see below).
  5. Submit your application and save the reference number for tracking status online.

📄 Required Documents for LNG Connection

DocumentPurposeNotes
Valid CNICIdentity verificationMust be original and active
Proof of Property OwnershipEligibility confirmationUtility bill, property deed, or NOC
Neighbor’s Gas BillInfrastructure verificationA recent bill is required
Photographs (Optional)Meter installation1–2 latest photos may be required

🏆 Priority Processing for Old Demand Notice Holders

If you previously received a demand notice for a natural gas connection, you are eligible for priority processing.

  • Apply through the special portal for existing applicants.
  • You don’t need to resubmit all documents.
  • Your connection will be processed faster than new applications.

📌 Tip: Ensure your CNIC and property details match your original submission to avoid delays.

Government Paid Internship ProgramGovernment Paid Internship Program 2025 – How to Apply Online?

🔄 Natural Gas to LNG: Mandatory Transition

All domestic gas connections are now based on LNG, as traditional natural gas supply is being phased out. Old applications that have not been processed are automatically cancelled.

Why LNG?

  • 🌱 Eco-friendly: Reduced carbon emissions.
  • 🔌 Reliable: Stable supply for urban areas.
  • 📊 Efficient: Easier billing and monitoring system.

💰 Updated Fee Structure 2025

SNGPL has revised connection fees based on property size, type of connection, and urgency. The exact amount will be displayed during the online application process.

CM Punjab Agriculture Internship ProgramLatest Breaking News:CM Punjab Agriculture Internship Program Phase 2 –
  • Standard connection: Regular processing time and lower fees.
  • Urgent connection: Higher fee but faster installation.

🔧 Meter Installation Process

Once your application is approved, here’s what happens next:

  1. An SNGPL technician schedules a site inspection.
  2. Your CNIC and property documents are verified again.
  3. The LNG meter is installed and connected to the pipeline.
  4. Gas flow is activated.
  5. Your first meter reading is recorded for billing.

📌 Tips for Smooth Installation:

  • Make sure your property is easily accessible.
  • Keep original documents and utility bills ready.
  • Confirm that your property is near an existing gas pipeline.

⚠️ Common Issues & Quick Solutions

IssueSolution
Old application cancelledReapply through the new LNG portal
Missing documentsDouble-check CNIC, property papers, and neighbor’s bill
Delays in urgent processingChoose urgent category and monitor status online
Demand notice confusionUse the special portal for existing applicants

✅ Key Benefits of LNG Domestic Gas Connections

  • 🌿 Environment-Friendly: Lower emissions and cleaner energy.
  • 🔁 Consistent Supply: Reliable gas flow in major cities.
  • 📱 Online Tracking: Real-time application and meter status.
  • 💡 Transparent Billing: Standardized monthly charges.

Final Thoughts

With SNGPL’s new 2025 LNG connection policy, applying for a domestic gas connection is now more transparent, efficient, and environmentally sustainable. If you haven’t applied yet — or had an old pending request — now is the perfect time to complete your application online and ensure a steady and eco-friendly gas supply for your home.

PM Kamyab Jawan LoanBreaking News: PM Kamyab Jawan Loan 2025 – Step-by-Step Guide
BISP Popup Redirect Whatsapp.
GET bisp 8171 Qist Free 13500
WhatsApp