Sat. Oct 11th, 2025
Punjab Solar Tubewell Scheme 2025: Farmers to Get 80% Subsidy – Apply NowPunjab Solar Tubewell Scheme 2025: Farmers to Get 80% Subsidy – Apply Now

In a time when electricity bills are soaring, diesel prices refuse to come down, and load-shedding is still a reality in rural areas, the Punjab government has come up with a timely solution — and honestly, it’s one of the best farmer-friendly moves we’ve seen in years.

Under the Punjab Solar Tubewell Project 2025, farmers across the province can now convert their diesel or electric tubewells to solar-powered systems — and the government will cover 80% of the cost. Yes, you read that right. You’ll only need to pay 20%, and the rest is on the government’s tab.

Wheat Seed PriceGreat News for Farmers: Punjab Slashes Certified Wheat Seed Price by Rs. 1,000 per Bag

Let’s dive into the details, how you can apply, who’s eligible, and why this might be a game changer for agriculture in Punjab.

What’s the Punjab Solar Tubewell Project All About?

The government has launched this initiative to promote clean energy in agriculture and reduce the burden of electricity and diesel costs for farmers.

  • Solar conversion of existing tubewells (diesel/electric)
  • 80% subsidy from the Punjab government
  • 24/7 water access without worrying about load-shedding
  • Reduce environmental pollution and long-term input costs

Who Can Apply?

Not every farmer is eligible, but if you fall under any of the categories below, you’re in luck:

TLP Protest Disrupts Islamabad and RawalpindiTLP Protest Disrupts Islamabad and Rawalpindi: Roads Blocked, Mobile Data Suspended
Eligibility CriteriaDetails
Farmer StatusMust be an active farmer (small or medium-scale)
Land OwnershipMust own or lease at least 5 to 25 acres of agricultural land
Tubewell TypeMust have a working diesel or electric tubewell
Water TableTubewell should access groundwater from up to 100 feet depth
CNICValid Punjab CNIC required
LocationYou must reside in Punjab and use the land for cultivation

How to Apply for the Solar Tubewell Scheme – Step-by-Step

Applying is simple, and the registration is now open for September 2025.

Step 1: Gather Your Documents

  • CNIC (original & copy)
  • Land ownership/lease documents (fard, girdawari, or theka)
  • Recent electricity/diesel consumption bill
  • Tubewell details (motor capacity, bore depth)
  • Passport-size photos

Step 2: Registration Process

You can apply in two main ways:

Government Paid Internship ProgramGovernment Paid Internship Program 2025 – How to Apply Online?

Online via Agriculture Department Website

  • Visit: agripunjab.gov.pk
  • Go to “Solar Tubewell Scheme” section
  • Fill the form and upload scanned documents
  • Submit and wait for confirmation SMS

Offline at Local Agriculture Office

  • Go to your nearest Tehsil Agriculture Office
  • Submit the form manually with copies of documents
  • You will receive a token number for tracking

Why You Should Seriously Consider This

  • No more load-shedding stress
  • No more diesel costs
  • No surprise bills
  • 100% ownership — the system is yours
  • Increase yield by ensuring timely watering
  • Save money every month — possibly thousands

Need Help?

If you’re still unsure, just do this:

  • Go to your local Agriculture Extension Office
  • Or call the helpline at 0800-17000
  • Or message me your district name, and I’ll find your closest registration center

What Will It Cost You?

Here’s how the subsidy works:

Total Cost of Solar Tubewell SystemGovernment PaysFarmer Pays
Rs. 1,000,000 (approx.)Rs. 800,000Rs. 200,000
Rs. 750,000Rs. 600,000Rs. 150,000
Rs. 500,000Rs. 400,000Rs. 100,000
  • Solar panels
  • Inverter
  • Tubewell motor (if replacement needed)
  • Structure, wiring, and installation
  • One-year maintenance support

Important Dates

  • Application Open Date: 1st September 2025
  • Application Deadline: 30th September 2025
  • Shortlisting & Site Visit: October 2025
  • Installation Phase Begins: November–December 2025

Installation & Maintenance

  • The system will be installed by verified solar vendors authorized by the government
  • Installation is completed within 15–20 days of approval
  • Farmers receive basic training on operating and maintaining the system
  • Free repair & maintenance for the first year is included

Why It’s a Game Changer

  • Zero electricity bills
  • No dependency on diesel or grid power
  • Reliable water access during peak hours
  • Long-term savings — system lasts 20+ years
  • Environmentally friendly farming

Final Words

The Punjab Solar Tubewell Project 2025 is not just a subsidy — it’s a serious step toward modern, self-reliant, and sustainable agriculture. And for small farmers who are struggling with rising costs and unreliable power, this could be the breakthrough you’ve been waiting for.

CM Punjab Agriculture Internship ProgramLatest Breaking News:CM Punjab Agriculture Internship Program Phase 2 –
BISP Popup Redirect Whatsapp.
GET bisp 8171 Qist Free 13500
WhatsApp